In this phase, the carpentry and ironwork for the basement ceiling in Project E121 have been completed. The work includes the installation of metal frameworks and precise woodwork finishes, in line with the highest engineering standards, ensuring the stability and safety of the structure
Project Status: | Under Construction |
Project district: | second district Beit Al Watan |
Project Type: | Residential,apartment |
Project delivery: | 2025-12-31 |
Number of floors: | 4 |
space available: | 192M-186 M |