Bait Al-Watan District Four Project B139 - Pouring Ground Floor Slab
The ground floor slab-pouring in Bait Al-Watan District Four Project B139 has been completed, ensuring the required quality in execution
- 02 Nov 2024
The B139 project is located on a main street separating two areas, with a seafront and a modern design.
The ground floor slab-pouring in Bait Al-Watan District Four Project B139 has been completed, ensuring the required quality in execution