In this project phase, carpentry and ironwork for the first-floor ceiling of Project E66 are underway. The work includes the installation of metal frameworks and the shaping of wooden surfaces according to the highest quality standards and engineering requirements, ensuring structural stability and sustainability

Project Status: Under Construction
Project district: Fifth Settlement
Project Type: Residential,apartment
Project delivery: 2025-12-31
Number of floors: 4
space available: M
Concrete structure
5 %
Interior finishes
0 %
Facade finishes and entrances
0 %

Overall Progress