In this project phase, carpentry and ironwork for the first-floor ceiling of Project E66 are underway. The work includes the installation of metal frameworks and the shaping of wooden surfaces according to the highest quality standards and engineering requirements, ensuring structural stability and sustainability
Project Status: | Under Construction |
Project district: | Fifth Settlement |
Project Type: | Residential,apartment |
Project delivery: | 2025-12-31 |
Number of floors: | 4 |
space available: | M |