Casting the second floor columns project d176
Casting the second-floor columns project d176
- 21 Dec 2023
The project is located on South Suez with a seafront view and a classic design.
Casting the second-floor columns project d176
The concrete structure works for South Suez Project D176 have been successfully completed, including the foundations and the core structure of the building.