Beit Al-Watan, the third district, project m110

  BEIT EL-WATN

Beit Al-Watan, the third district, project m110

The project is located on a street with a width of 36 m, with a sea front, with a modern design. The project is divided into a ground floor and 3 recurring floors.
The floor contains two space units, starting from 191 m for the ground floor, and from 225 m for the upper floor.
Project receipt date: 12/2023

Close to the club area such as "Platinum Club - Al Jazira Club - Wadi Degla Club - Police Club"

It is also surrounded by a group of the finest compounds such as "Palm Hills - Al Marasem - Mountain View I city"

  • Project Status: Under Construction
  • Project district:third district Beit Al-Watan
  • Project Type:Residential,apartment
  • Project delivery:2024-06-30
  • Number of floors:4
  • space available: 285M-191M-184 M

Features


Beit Al-Watan, the third district, project m110 The project is located on a street with a width of 36 m, with a seafront
Central Receiver
Beit Al-Watan, the third district, project m110 The project is located on a street with a width of 36 m, with a seafront
Luxury Entrances
Beit Al-Watan, the third district, project m110 The project is located on a street with a width of 36 m, with a seafront
Garage
Beit Al-Watan, the third district, project m110 The project is located on a street with a width of 36 m, with a seafront
Elevator
Beit Al-Watan, the third district, project m110 The project is located on a street with a width of 36 m, with a seafront
Fingerprint
Beit Al-Watan, the third district, project m110 The project is located on a street with a width of 36 m, with a seafront
Security Guards
Beit Al-Watan, the third district, project m110 The project is located on a street with a width of 36 m, with a seafront
classical interface
Beit Al-Watan, the third district, project m110 The project is located on a street with a width of 36 m, with a seafront
Equipped water tanks
Beit Al-Watan, the third district, project m110 The project is located on a street with a width of 36 m, with a seafront
Water filter preparation
Beit Al-Watan, the third district, project m110 The project is located on a street with a width of 36 m, with a seafront
Air conditioning
Beit Al-Watan, the third district, project m110 The project is located on a street with a width of 36 m, with a seafront
Security Camera

Video

00

Days

00

Hours

00

Minutes

00

Seconds

.

Concrete structure
100 %
Interior finishes
90 %
Facade finishes and entrances
90 %

Overall Progress

You need more information about our price?

Related Projects

Details Beit Al-Watan, the first district, project B117
Details Beit Al Watan, in First Settlement, Project i17
Details fourth district of Beit El Watan, Project C166 is located in the fourth district of Beit El Watan

fourth district of Beit El Watan, Project C166

New Cairo - BEIT EL-WATN
09.
Details Project D80 in Fifth Settlement Beit El Watan is located in Fifth Settlement Beit El Watan

Project D80 in Fifth Settlement Beit El Watan

New Cairo - BEIT EL-WATN
11.
Details Beit Al Watan
Details E66 Project in Fifth Settlement, Beit Al Watan, Fifth Settlement

E66 Project in Fifth Settlement, Beit Al Watan

New Cairo - BEIT EL-WATN
15.
Details Luxury Living Unveiled: Explore Project K66 in Third District Beit El Watan, New Cairo

Project K66 Third District Beit El Watan

New Cairo - BEIT EL-WATN
16.
Details Project A109 in the Second District Beit El Watan Classic Design for Sustainable and Luxurious

Beit El Watan Second District Project A109

New Cairo - BEIT EL-WATN
17.
Details The A148 project in Beit El Watan, Phase 4 is one of the latest and most promising residential developments in the heart of New Cairo.

The A148 project in Beit El Watan

New Cairo - BEIT EL-WATN
18.

Subscribee

Want to be notified about our News. Just sign up and we'll send you a notification by email.

Get In Touch